Action Item PT-1-2: Hans-Peter Plag to take contact with the coordinator of EDIOS. Responsible: Hans-Peter Plag, Deadline: 30 May 2003.

Rational: The European Directory of the Initial Ocean Observing System (EDIOS), which is a directory of ongoing operational measurements relevant to EuroGOOS. Coordinator is Jennifer Weaduin. ESEAS should establish a cooperation.

Status of Action Item PT-1-2: Delayed. EDIOS has not been contacted so far. However, EDIOS is also member of the Operational Forecasting Cluster and in that frame, contact is automatically given. There are several relevant projects in the OF Cluster, that will be contacted in the near future.
Reported on 22/01/2004 by Hans-Peter Plag.

Change of Action Item PT-1-2: EDIOS still should be contacted in order to establish a cooperation. Changed at: PT-2 New Deadline: 30 November 2003.

Action Item PT-1-3: Hans-Peter Plag to contact J. Dow to find out about the ESEAS proposal. Responsible: Hans-Peter Plag, Deadline: 30 May 2003.

Rational: Concerning the IGS TIGA project, the issue how IGS TIGA and ESEAS can cooperate is still not clarified.

Status of Action Item PT-1-3: Delayed. Hans-Peter Plag has been in contact with John Dow, Chair of the IGS GB, and Tilo Schoene, chair of the TIGA WG during the AGU meeting in December 2003. It was agreed that Tilo Schoene will make an attempt to follow the WP2 work and investigate which of the TIGA Analysis Centres are interested in a comparison of the analysis strategies.
Reported on 22/01/2004 by Hans-Peter Plag.

Change of Action Item PT-1-3: The issue needs to be clarified soon. Therefore, J. Dow needs to be contacted again. Changed at: PT-2 New Deadline: 30 November 2003.

Action Item PT-1-4: Hans-Peter Plag to send an e-mail to ESEAS GB to prepare the meeting and ask for changes in the membership. Responsible: Hans-Peter Plag, Deadline: 30 May 2003.

Rational: This refers to the November 2003 GB meeting.

Status of Action Item PT-1-4: Delayed. The issue was taken up during the Fourth GB meeting and will be handled in the course of prolonging the ESEAS initial project, which ends in July 2004.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-1-5: Richard Bingley to send an e-mail to ESEAS TEC to prepare the meeting and ask for changes in the membership. Responsible: Richard Bingley, Deadline: 30 May 2003.

Rational: This refers to the TEC meeting planned for November 2003.

Status of Action Item PT-1-5: Delayed. The issue was taken up at the Fourth ESEAS Gb meeting and the problem will be handled in the course of the prolongation of the ESEAS initial phase, which ends in July 2004.
Reported at PT-2 by Hans-Peter Plag.

Action Item PT-1-6: Richard Bingley to produce a new version of the requirements and classification based on a lower number of applications. Responsible: Richard Bingley, Deadline: 15 June 2003.

Rational: The number of applications proposed by Richard Bingley in the last version of the requirements and classification was rather large.

Status of Action Item PT-1-6: Closed. Action was carried out and number of applications reduced to four with one split into two.
Reported at PT-2 by Richard Bingley.

Action Item PT-1-7: Lesley J. Rickards to revise the quality control document and to distribute it to the task members. Responsible: Lesley J. Rickards, Deadline: 15 June 2003.

Rational: Maria-Jesus Garcia has produced a QC-Document for the first PT meeting. This document needs thorough revision.

Status of Action Item PT-1-7: Delayed. The document will be finalised during the WP1 meeting in January 2004.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-1-8: Hans-Peter Plag and Hanne Heiberg to define the structure of the data flow from Data Centres to user through the Web Page to ask the Data Centres to start uploading. Responsible: Hans-Peter Plag, Deadline: 31 May 2003.

Rational: The final website and the intermediate data server are required to place minimum requirements on software, hardware and procedures at the data centres and users. This requires a heterogenous system, which most available systems do not allow for. Therefore, a specific ESEAS package nneds to be developed.

Status of Action Item PT-1-8: Delayed. In progress. First data up-loaded. The structure, procedures and tools will be discussed at the WP1 meeting in January 2004.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-1-9: Hanne Heiberg with help from Halfdan Kierulf and others to establish the CGPS archive at the ESEAS CB server. Responsible: Halfdan Pascal Kierulf, Deadline: 31 May 2003.

Status of Action Item PT-1-9: Closed.. Work done in October 2003.
Reported at PT-2 by Hans-Peter Plag.

Action Item PT-1-10: Hans-Peter Plag to send information to Guy Woppelmann/TIGA about the ESEAS CGPS archive. Responsible: Hans-Peter Plag, Deadline: 31 May 2003.

Status of Action Item PT-1-10: Pending. This can be done as soon as the ESEAS GB accepts a cooperation with TIGA as agreed under AI PT-1-3.
Reported at PT-2 by Hans-Peter Plag.

Action Item PT-1-11: Hans-Peter Plag to send out an inquiry to get input concerning the contents of the time series files. Responsible: Hans-Peter Plag, Deadline: 31 May 2003.

Rational: Concerning AI WP2/WG2-1-11, no information has been received so far. Therefore, the contents of the time series file need clarification.

Status of Action Item PT-1-11: Delayed. Some input received but not assessed so far. However, Hans-Peter Plag and Halfdan Pascal Kierulf have developed an initial format for time series, that is sufficiently variable to allow for all necessary information to be added at a later stage. This will be discussed both at the WP1 and WP2 meetings in January and February 2004, respectively.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-1-12: Hanne Heiberg to send out an inquiry to get the data for the spectra of at least two (tbd) of the control stations for combined plots. Responsible: Hanne Heiberg, Deadline: 31 May 2003.

Rational: The results obtained so far for the control stations differ very much between the groups. For the different spectra produced for the control stations, a plot combining the spectra should be produced for comparison. For that, the partners should submit the data used to produce the plots.

Status of Action Item PT-1-12: Delayed. Some input received but not assessed so far.
Reported at PT-2 by Hans-Peter Plag.

Action Item PT-1-13: Hans-Peter Plag to produce combined plots of the spectra of control stations for comparison. Responsible: Hans-Peter Plag, Deadline: 15 June 2003.

Status of Action Item PT-1-13: Delayed. Some work has been done by Mikis Tsimplis and Andrew Shaw and will be discussed during the WP3 meeting in January.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-1-16: Hans-Peter Plag to invite articles to the newsletter according to the list established at the meeting. Responsible: Hans-Peter Plag, Deadline: 30 May 2003.

Status of Action Item PT-1-16: Obsolete. At the ESEAS GB, it was decided not to produce a newsletter.
Reported at PT-2 by Hans-Peter Plag.

Action Item PT-2-3: Lesley J. Rickards to provide the revised Quality Control Document to the ESEAS CB. Responsible: Lesley J. Rickards, Deadline: 30 November 2003.

Status of Action Item PT-2-3: Delayed. See Status of AI PT-1-3.
Reported on 22/01/2004 by ESEAS Central Bureau.

Action Item PT-2-4: Hanne Heiberg to make the revised Quality Control Document available on the Status Web page. Responsible: Hanne Heiberg, Deadline:

Status of Action Item PT-2-4: Pending.
Reported on 22/01/2004 by ESEAS Central Bureau.

Action Item PT-2-10: Juan Jose Martinez-Benjamin , UPC to add the results for their processing using GIPSY/OASIS II with PPP and JPL products to the ESEAS CGPS data a Responsible: Juan Jose Martinez-Benjamin, Deadline: 15 Dec 2003.

Status of Action Item PT-2-10: Delayed.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-12: All members of the Task 2.3 team to look at their own processing of the extended sample data set and investigate how their results may be improved, considering the results from the other members of the task T2.3 team. Responsible: Halfdan Pascal Kierulf, Deadline: 31 Dec 2003.

Rational: The differences in the solutions are too large to be accepted. One step is that every Analysis Centre tries to improve their own analysis procedure individually.

Status of Action Item PT-2-12: Unknown.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-13: GCM and SRC to investigate any issues relating to their strategy for reference frame definition. Responsible: Halfdan Pascal Kierulf, Deadline: 30 Nov 2003.

Status of Action Item PT-2-13: Unknown.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-14: NMA and ROA to re-process the extended sample data set using GIPSY/OASIS II with PPP and IGS products and add these results to the ESEAS CGPS data archive Responsible: Halfdan Pascal Kierulf, Deadline: 30 Nov 2003.

Rational: The results produced by UNOTT using Bernese with IGS products in precise point positioning approach are considerable worse than all other solutions. It is not clear whether this is due to the IGS products or Bernese ppp or the combination of the two. Using GIPSY PPP with IGS, which seems to result in degraded time series, will help to clarify the situation.

Status of Action Item PT-2-14: Unknown.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-15: UNOTT to make a conclusion regarding Bernese 4.2 with PPP and IGS products; Responsible: Richard Bingley, Deadline: 15 Dec 2003.

Status of Action Item PT-2-15: Unknown.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-16: Hans-Peter Plag to provide input for the strategy definition document for Task 2.2. Responsible: Hans-Peter Plag, Deadline: 15 Dec 2003.

Status of Action Item PT-2-16: Unknown.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-17: Coskun Demir and Hans-Peter Plag to define the master file for the levelling information. Responsible: Coskun Demir, Deadline: 15 Dec 2003.

Status of Action Item PT-2-17: Delayed. Most of it is done. Will be finalised during the WP1 meeting..
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-18: Coskun Demir to contact others projects such as the EULVN project to find out which an how levelling information is compiled. Responsible: Coskun Demir, Deadline: 15 Dec 2003.

Status of Action Item PT-2-18: Unknown.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-19: Mikis Tsimplis to give feedback concerning data errors of the analysis to PSMSL Responsible: Mikis Tsimplis, Deadline: 30 Dec 2003.

Rational: The quality control work done in Task 3.1 should be made available to a larger community. This can be achieved through information made available to PSMSL.

Status of Action Item PT-2-19: Unknown.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-20: Mikis Tsimplis to provide corrected tide gauge monthly data to ESEAS CB Responsible: Mikis Tsimplis, Deadline: 30 Dec 2003.

Status of Action Item PT-2-20: Delayed..
Reported on 22/01/2004 by ESEAS Central Bureau.

Action Item PT-2-21: Mikis Tsimplis to provide a discussion and potential explanation of the differences in the spectra calculated by the different partners. Responsible: Mikis Tsimplis, Deadline: 25 Dec 2003.

Status of Action Item PT-2-21: Delayed. Will be done at the WP3 meeting..
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-23: Mikis Tsimplis to draft a paper reporting the results of Task 3.1. Responsible: Mikis Tsimplis, Deadline: 20 Jan 2004.

Status of Action Item PT-2-23: Changed. Open..
Reported on 12/12/2003 by ESEAS Central Bureau.

Action Item PT-2-26: All partners planning to install a new CGPS site to prepare a brief description of the new site and provide it to WP2 leader for assessment. Responsible: Dov Rosen, Deadline: 31 March 2004.

Rational: New CGPS sites are in most cases choosen by non-experts (tide gauge operators). In order to avoid unnecessary problems due to unfavourable site conditions, an assessment by CGPS experts is necessary prior to the installation of the site.

Status of Action Item PT-2-26: Open. Up to now, only Ivica Vilibic sent a description (on 09/12/2003) to Richard Bingley and asked for comments. It is not known whether he received any comments so far.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-27: At proposed new CGPS sites, test GPS measurements have to be carried out at each potential location for the GPS antenna (preferably over two consequtive days) and the data have to be assessed and analysed by the ESEAS GPS ACs. Responsible: Dov Rosen, Deadline: 31 Jan 2004.

Rational: Experience shows that GPS conditions can vary considerably over short distances and without actual measurements, it is extremely difficult to assess GPS conditions thoroughly. In order to ensure good site quality, test observations with GPS receivers of geodetic quality are required.

Status of Action Item PT-2-27: Open. This important AI has to be taken up at the WP4 workshop, where actually results of the test observations are supposed to be discussed.
Reported on 22/01/2004 by Hans-Peter Plag.

Change of Action Item PT-2-27: The AI is very important in order to limit the further delay in deployment of the GPS stations. Changed at: WP4-2 New Deadline: 31 March 2004.

Action Item PT-2-28: Luciana Fenoglio-Marc to check whether the WP1/WP3 meeting can be held on 28-30 January in Darmstadt. Responsible: Luciana Fenoglio-Marc, Deadline: 30 Nov 2003.

Status of Action Item PT-2-28: Closed. Confirmed
Reported by ESEAS Central Bureau.

Action Item PT-2-29: Begona Perez Gomez to check whether the WP2/WP4 meeting can be held on 11-13 February in Madrid. Responsible: Begona Perez Gomez, Deadline: 30 Nov 2003.

Status of Action Item PT-2-29: Closed. Confirmed.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-31: With respect to M1.7, Lesley J. Rickards to provide information about which data are supposed to be digitized Responsible: Lesley J. Rickards, Deadline: 31 Dec 2003.

Status of Action Item PT-2-31: Unknown.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-32: With respect to M2.6, Richard Bingley to contact POL in order to get the absolute gravity time series for eseas.org. Responsible: Richard Bingley, Deadline: 30 Nov 2003.

Status of Action Item PT-2-32: Unknown.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-33: All partners to provide references to presentations and publications for Section 2 of the Annual Report. Responsible: all Deadline: 20 Nov 2003.

Status of Action Item PT-2-33: Open. For the Annual Report, some partners provided reference. However, it is assumed that many partners did not do so. The list is continuously updated and all partners are urged to send their references to the CB. The list will soon be made available on the web and contionously updated there.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-34: All partners to provide posters and presentations to the ESEAS CB for inclusion on eseas.org. Responsible: all Deadline: open.

Status of Action Item PT-2-34: Open. Up to now, not much has come in. All partners are urged to send posters and presentations to the CB.
Reported on 22/01/2004 by Hans-Peter Plag.

Action Item PT-2-35: Hans-Peter Plag to inform everybody about the requirements for documentation of who worked when on the project. Responsible: Hans-Peter Plag, Deadline: 30 November 2003.

Status of Action Item PT-2-35: Delayed. Hans-Peter Plag apologises for having forgotten this important AI! It will be checked as soon as possible with the Commission.
Reported on 22/01/2004 by Hans-Peter Plag.



Action Item PT-3-4: Hans-Peter Plag to ask the ESEAS community to provide information for the ESEAS web page "About Sea Level". Responsible: Hans-Peter Plag, Deadline: 20 May 2004.

Rational: The ESEAS web page should be an information source for sea level. Currently, very little is available of interest for non-scientific users. This is a major deficit of ESEAS, which can fairly easily be corrected.

Action Item PT-3-5: Halfdan Pascal Kierulf to provide the time series of displacement due to air pressure loading for all ESEAS CGPS sites. Responsible: Halfdan Pascal Kierulf, Deadline: 30 June 2004.

Action Item PT-3-7: Per Knudsen to clarify whether Mikis Tsimplis can take the leadership for T3.4. Responsible: Per Knudsen, Deadline: 20 May 2004.

Action Item PT-3-8: Hans-Peter Plag to contact Maria-Jesus Garcia and to clarify the status of the CGPS receiver, which is supposed to deliver data since early April. Responsible: Hans-Peter Plag, Deadline: 20 May 2004.

Action Item PT-3-9: Hans-Peter Plag to contact all partners with pending CGPS installation and to urge them to progress as soon as possible since otherwise their installation may not be useable for ESEAS-RI. Responsible: Hans-Peter Plag, Deadline: 20 May 2004.

Action Item PT-3-10: Bente Lilja Bye to ensure that the TIP is initialised for the project and all partners are registered on the web page. Responsible: Bente Lilja Bye, Deadline: 30 June 2004.

Action Item PT-3-11: Per Knudsen to identify and invited two speakers for the altimetry session of the ESEAS Workshop. Responsible: Per Knudsen, Deadline: 15 June 2004.

Action Item PT-3-12: Hans-Peter Plag to identify and invite the speakers for all sessions (except session 3) for the ESEAS Workshop. Responsible: Hans-Peter Plag, Deadline: 15 June 2004.

Action Item PT-3-13: Bente Lilja Bye to check CORDIS for calls in the field of "Research Infrastructure". Responsible: Bente Lilja Bye, Deadline: 15 June 2004.

Action Item PT-3-14: Hans-Peter Plag to contact Philip L. Woodworth and Torkild Aarup and to discuss membership of GLOSS in GEO. Responsible: Hans-Peter Plag, Deadline: 31 May 2004.

Action Item PT-3-15: Alan Edwards to send the names of potential correspondents in the IMSO (Information Management System ) to Hans-Peter Plag . Responsible: Alan Edwards, Deadline: 15 June 2004.

Action Item PT-3-16: Lesley J. Rickards to ensure that the quality control document is finalised and made available on the delivery page. Responsible: Lesley J. Rickards, Deadline: 30 June 2004.

Rational: According to AI PT-2-3, the document was supposed to be available in Nov. 2003. It now needs to be made available a.s.a.p.

Action Item PT-3-17: Lesley J. Rickards to ensure together with the T1.2 members and the whole ESEAS consortium that a standard ESEAS Quality Control software is defined and that the programs are made available for down-load on the ESEAS Web server. Responsible: Lesley J. Rickards, Deadline: 30 June 2004.

Rational: A standard software package for quality control compliant to the quality control document is a necessary step towards a homogeneous ESEAS data quality. Initially, the software is made available for down-load. However, a next step should be to have the software installed on the ESEAS Data Server.

















Action Item WP4-2-1: Dov Rosen to prepare a table of the CGPS sites to be established and include key parameters concerning the status (description available, test measurements done, data processed, results). Responsible: Dov Rosen, Deadline: 12 February 2004.

Status of Action Item WP4-2-1: Open.
Reported at PT-3 by Hans-Peter Plag.

Change of Action Item WP4-2-1: The table was provided during the WP4-2 meeting. This table is to be updated with additional parameters and information after further information from participants is received. Changed at: WP4-2 New Deadline: 31 March 2004.

Action Item WP4-2-2: Begona Perez Gomez and Belen Martin Miguez to prepare a draft delivery report for the Task 4.1 experiment. Responsible: Belen Martin Miguez, Deadline: 1 July 2004.

Status of Action Item WP4-2-2: Open.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-3: Dov Rosen to prepare a table of the tide gauge sites to be upgraded and include key parameters concerning the status (equipment purchased, site upgraded, data available, comments on results). Responsible: Dov Rosen, Deadline: 12 February 2004.

Status of Action Item WP4-2-3: Open.
Reported at PT-3 by Hans-Peter Plag.

Change of Action Item WP4-2-3: The table was provided during the WP4-2 meeting. This table is to be updated with additional parameters and information after further information from participants is received. Changed at: WP4-2 New Deadline: 31 March 2004.

Action Item WP4-2-4: Begona Perez Gomez together with Dov Rosen and Lesley J. Rickards to prepare software for the ESEAS QC to be installed on the ESEAS DS. Responsible: Begona Perez Gomez, Deadline: 31 May 2004.

Status of Action Item WP4-2-4: Open.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-5: Bojan Cernac to compile short descriptions of operational calibration methods for tide gauges based on input from experienced partners (e.g. Maria-Jesus Garcia , Begona Perez Gomez , Philip L. Woodworth . Responsible: Bojan Cernac, Deadline: 31 May 2004.

Status of Action Item WP4-2-5: Open.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-6: Begona Perez Gomez to deliver the GPS data of the campaigns from Barcelona and Bilbao to the ESEAS DS. Responsible: Begona Perez Gomez, Deadline: 30 April 2004.

Status of Action Item WP4-2-6: Unknown.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-7: Jose Martin Davila to deliver the GPS data of the campaigns from Cadiz, Tarifa and Malaga to the ESEAS DS. Responsible: Jose Martin Davila, Deadline: 30 April 2004.

Status of Action Item WP4-2-7: Unknown.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-8: Coskun Demir to deliver the GPS data of the campaign from Antalya-II starting with 1995 to the ESEAS DS. Responsible: Coskun Demir, Deadline: 30 April 2004.

Status of Action Item WP4-2-8: Closed. Data from Antalya-II have been uploaded to the CGPS server.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-9: Halfdan Pascal Kierulf to contact Eimuntas Parseliunas and to clarify delivery of the GPS data from Klaipeda to the ESEAS DS. Responsible: Halfdan Pascal Kierulf, Deadline: 28 February 2004.

Status of Action Item WP4-2-9: Unknown.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-10: Dov Rosen to deliver the GPS data of the campaigns from stations in the responsibility of P18 to the ESEAS DS. Responsible: Dov Rosen, Deadline: 31 August 2004.

Status of Action Item WP4-2-10: Unknown.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-11: Ryszard Zdunek to deliver the GPS data of the campaigns from Wladislawowo to the ESEAS DS. Responsible: Ryszard Zdunek, Deadline: 30 April 2004.

Status of Action Item WP4-2-11: Closed. The data have been delivered to the ESEAS CGPS server.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-12: All those who are responsible for an upgraded tide gauge to provide information about data upload to the ESEAS DS (latency, start date, rate) or about the server to down-load data from (IP address, access, latency, start date, rate). Responsible: ALL, Deadline: 28 February 2004.

Status of Action Item WP4-2-12: Open. The information was not provided so far.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-13: All those who are responsible for establishment of a CGPS site to make every effort to get the site installed and operational a.s.a.p. and to report to the coordinator a realistic date for the data availability. Responsible: ALL, Deadline: 15 March 2004.

Status of Action Item WP4-2-13: Open. Efforts have been made by IOLR, PE, and IEO to get the sites established as soon as possible. The site CSAR appear to be up. It is not clear whether the sites established by PE and IEO are operational. PE carried out a test campaign which was evaluated by the ACs. IEO informed early in April that the data will be uploaded soon.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-14: All EOS owner to provide information on those sites that are co-located with CGPS concerning access to the CGPS data and the level of connection between CGPS and the tide gauge. Responsible: ALL, Deadline: 31 March 2004.

Status of Action Item WP4-2-14: Open. Up to now, only for the site at WLAD, the information is available and data is being uploaded operationally. The station CSAR has started to upload data. The same is true for ANTA. However, the additional information on co-location (local ties) is not available.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP4-2-15: Richard Bingley to contact none-ESEAS-RI owners of EOS to get information about co-located CGPS sites and permission to use the CGPS data for the ESEAS-RI project. Responsible: ALL, Deadline: 31 March 2004.

Status of Action Item WP4-2-15: Unknown.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP2-3-1: Richard Bingley to initiate that requirements for AG sites are explicitly written down. This task should be carried out in the frame of the ESEAS TEC. Responsible: Richard Bingley, Deadline: 31 August 2004.

Rational: Clear requirements for AG sites should be made available on the ESEAS web page to aid ESEAS members in case they want to upgrade a ESEAS Observing Site for AG measurements.

Status of Action Item WP2-3-1: Open.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP2-3-2: Halfdan Pascal Kierulf to organise a new analysis test comparison with CGPS data for Jan 2000 to present from approx. five stations. Responsible: Halfdan Pascal Kierulf, Deadline: 15 April 2004.

Rational: This experiment is done in order to check whether older IGS products are of sufficient quality to create ESEAS time series. At least GIPSY PPP and Bernese network solution should be compared, but preferably all ACs should participate. It could also be worthwhile to process all data for approx. five stations from Jan 2000 to present, since this would give a chance to determine and compare long-term rates.

Status of Action Item WP2-3-2: Closed. The results will be presented at PT-3.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP2-3-3: Richard Bingley and Halfdan Pascal Kierulf together with Tilo Schoene to select five stations for the test in AI WP2-3-2, which are also processed by TIGA. Responsible: Richard Bingley, Deadline: 15 March 2004.

Status of Action Item WP2-3-3: Closed. This was done together with Tilo Schoene .
Reported at PT-3 by Hans-Peter Plag.

Action Item WP2-3-4: Hans-Peter Plag to send out the Master files for GPS site documentation to the GPS analysis groups for comments. Responsible: Hans-Peter Plag, Deadline: 28 February 2004.

Status of Action Item WP2-3-4: Open. Not yet done.
Reported at PT-3 by Hans-Peter Plag.

Action Item WP2-3-5: Halfdan Pascal Kierulf to send out the ESEAS Time series files for comments. Responsible: Halfdan Pascal Kierulf, Deadline: 28 February 2004.

Status of Action Item WP2-3-5: Open. Not yet done.
Reported at PT-3 by Hans-Peter Plag.

Action Item COOR-1: To report on status of action items Responsible: all Deadline: 31 January 2004.

Status of Action Item COOR-1: Closed. Some partners have reported back but most have not. The disciplin concerning AI is not the best.
Reported at PT-3 by Hans-Peter Plag. WP1.3-1: Ryszard Zdunek make maps for ESEAS data portal Responsible: Ryszard Zdunek, Deadline: 2004/06/30.

Rational: The website will consist of maps and tables (see description above). P19 (SRC) will make maps based on their previous work with CGPS including tables. Map needs bathymetry. Hans-Peter Plag will provide simple table to Ryszard Zdunek to see if map can be produced, also directory where table and map is with sub-directori

Action Item WP1.3-2: Begona Perez Gomez to do quality check by comparing available software. Responsible: Begona Perez Gomez, Deadline: 2004/10/31.

Rational: Intercomparison of available software - try several time series to check we all do the same, including maybe synthetic time s It is useful to have a windows version uploaded somewhere, and also somewhere on a unix/linux server. Graphical interfaces would b Mikis Tsimplis shall provide some timeseries. Dov Rosen shall make a Windows version available for quality control in parallell.

Action Item WP1.3-3: Hans-Peter Plag wil work out "Interface definition to data access manager (tables and data sets)" Responsible: Hans-Peter Plag, Deadline: 2004/06/30.

Action Item WP1.3-4: Begona Perez Gomez to push partners to update master files. Responsible: Begona Perez Gomez, Deadline: 2004/08/31.

Rational: Hans-Peter Plag - ftp demo all set up, ftp.gdiv.statkart.no - checked with IEO and NMA - has directory structure set up. Documentation

Action Item PT-3-1: Hans-Peter Plag to ask the consortium for agreement to have Bente Lilja Bye as new coordinator. Responsible: Hans-Peter Plag, Deadline: 30 June 2004.

Alan Edwards informed that he most likely has to step down as responsible officer for ESEAS. Gilles Ollier will take over. He has a background in marine science and strongly advocates the research in that field.

Action Item PT-3-2: Hans-Peter Plag to inform the consortium about the requirements for documentation of human resources spend on the project. Responsible: Hans-Peter Plag, Deadline: 20 May 2004.

Rational: There are clear requirements for documentation of human resources used in the project. These need to be followed in order to avoid problems during audits.

Action Item PT-3-3: Hans-Peter Plag to call for a Task 1.3 meeting in order to consolidate the development of the ESEAS Data Portal. Responsible: Hans-Peter Plag, Deadline: 20 May 2004.

Rational: The ESEAS Data Portal needs urgently be established and therefore, the current bottleneck due to a lack of resources at NMA needs to be eliminated. This requires input from all ESEAS-RI partners who have the right expertise. The meeting should take place in June with the goal to get the DP opeartional by September.

Action Item PT-3-4: Hans-Peter Plag to ask the ESEAS community to provide information for the ESEAS web page "About Sea Level". Responsible: Hans-Peter Plag, Deadline: 20 May 2004.

Rational: The ESEAS web page should be an information source for sea level. Currently, very little is available of interest for non-scientific users. This is a major deficit of ESEAS, which can fairly easily be corrected.

Action Item PT-3-5: Halfdan Pascal Kierulf to provide the time series of displacement due to air pressure loading for all ESEAS CGPS sites. Responsible: Halfdan Pascal Kierulf, Deadline: 30 June 2004.

Action Item PT-3-6: Per Knudsen together with Hans-Peter Plag to organise a Task 3.3 meeting in June in order to assess the results of T3.1 and T3.2 and to decide how to solve T3.3. Responsible: Per Knudsen, Deadline: 20 May 2004.

Action Item PT-3-7: Per Knudsen to clarify whether Mikis Tsimplis can take the leadership for T3.4. Responsible: Per Knudsen, Deadline: 20 May 2004.

Action Item PT-3-8: Hans-Peter Plag to contact Maria-Jesus Garcia and to clarify the status of the CGPS receiver, which is supposed to deliver data since early April. Responsible: Hans-Peter Plag, Deadline: 20 May 2004.

Action Item PT-3-9: Hans-Peter Plag to contact all partners with pending CGPS installation and to urge them to progress as soon as possible since otherwise their installation may not be useable for ESEAS-RI. Responsible: Hans-Peter Plag, Deadline: 20 May 2004.

Action Item PT-3-10: Bente Lilja Bye to ensure that the TIP is initialised for the project and all partners are registered on the web page. Responsible: Bente Lilja Bye, Deadline: 30 June 2004.

Action Item PT-3-11: Per Knudsen to identify and invited two speakers for the altimetry session of the ESEAS Workshop. Responsible: Per Knudsen, Deadline: 15 June 2004.

Action Item PT-3-12: Hans-Peter Plag to identify and invite the speakers for all sessions (except session 3) for the ESEAS Workshop. Responsible: Hans-Peter Plag, Deadline: 15 June 2004.

Action Item PT-3-13: Bente Lilja Bye to check CORDIS for calls in the field of "Research Infrastructure". Responsible: Bente Lilja Bye, Deadline: 15 June 2004.

Action Item PT-3-14: Hans-Peter Plag to contact Philip L. Woodworth and Torkild Aarup and to discuss membership of GLOSS in GEO. Responsible: Hans-Peter Plag, Deadline: 31 May 2004.

Action Item PT-3-15: Alan Edwards to send the names of potential correspondents in the IMSO (Information Management System ) to Hans-Peter Plag . Responsible: Alan Edwards, Deadline: 15 June 2004.

Action Item PT-3-1: Hans-Peter Plag to ask the consortium for agreement to have Bente Lilja Bye as new coordinator. Responsible: Hans-Peter Plag, Deadline: 30 June 2004.

Action Item WP1.3-1: Ryszard Zdunek make maps for ESEAS data portal Responsible: Ryszard Zdunek, Deadline: 2004/06/30.

Rational: The website will consist of maps and tables (see description above). P19 (SRC) will make maps based on their previous work with CGPS including tables. Map needs bathymetry. Hans-Peter Plag will provide simple table to Ryszard Zdunek to see if map can be produced, also directory where table and map is with sub-directori

Action Item WP1.3-2: Begona Perez Gomez to do quality check by comparing available software. Responsible: Begona Perez Gomez, Deadline: 2004/10/31.

Rational: Intercomparison of available software - try several time series to check we all do the same, including maybe synthetic time s It is useful to have a windows version uploaded somewhere, and also somewhere on a unix/linux server. Graphical interfaces would b Mikis Tsimplis shall provide some timeseries. Dov Rosen shall make a Windows version available for quality control in parallell.

Action Item WP1.3-3: Hans-Peter Plag wil work out "Interface definition to data access manager (tables and data sets)" Responsible: Hans-Peter Plag, Deadline: 2004/06/30.

Action Item WP1.3-4: Begona Perez Gomez to push partners to update master files. Responsible: Begona Perez Gomez, Deadline: 2004/08/31.

Rational: Hans-Peter Plag - ftp demo all set up, ftp.gdiv.statkart.no - checked with IEO and NMA - has directory structure set up. Documentation

Action Item PT-5-1: Produce a list of ESEAS-RI/ESEAS members that we expect data from. Responsible: Xiuhua Zhang, Deadline: 2005/05/24.

Action Item PT-5-2: Make available the tide gauge data from a group of members: Spain, UK (some) and Norway on the ESEAS web site immediately. Responsible: Responsible: Xiuhua Zhang and contact persons from Spanish, UK and Norwegian members, Deadline: 2005/05/31.

Action Item PT-5-3: Users shall be able to search the tide gauge data available on the ESEAS web site after areas, period and country. Responsible: Xiuhua Zhang, Deadline: 2005/05/31.

Action Item PT-5-4: The ESEAS web site shall have links to those ESEAS-RI/ESEAS members that have their own website with tide gauge data. Responsible: Xiuhua Zhang, Deadline: 2005/05/31.

Action Item PT-5-5: ESEAS historical data made available on the website shall at least start from year 2000. Responsible: Xiuhua Zhang, Deadline: 2005/05/31.

Action Item PT-5-6: Partners that have calculated monthly means shall deliver those to PSMSL / Phillip Woodworth continously. Responsible: All, Deadline: immediately.

Action Item PT-5-7: The Coordinator shall send a request for levelling data. The request shall be formulated by Task 2.7 leader Coskun Demir, referring to Item WP2/WG2-5-16. Responsible: Bente Lilja Bye, Coskun Demir, Deadline: 2005/05/31.

Action Item PT-5-8: Task 3.3 will be concluded by 31. May 2005. Responsible: Per Knudsen, Deadline: 2005/05/31.

Action Item PT-5-9: Newly identified contribution from P3, Phil Woodworth, will be included in Deliverable 3.5. Responsible: Per Knudsen, Deadline: 2005/05/31.

Action Item PT-5-10: A Voluntarily contribution on higher frequency samling will be added to the next version of deliverable 4.1. Responsible: Begona Perez,, Deadline: next update of D 4.1.

Action Item PT-5-11: Include the ESEAS-RI participation at the EU Workshop on tsunami 28 February %G–%@ 1 March 2005 in Brussels and the presentation of ESEAS at the MedCLIVAR seminar in Vienna during EGU 26. April 2005 in the Activity report. Responsible: Bente Lilja Bye, Deadline: 2005/05/31.

Action Item PT-5-12: make an estimate of the expected full year expenditure. Responsible: All Partners, Deadline: 2005/05/31.

Action Item PT-5-13: A control of the Draft Management report particularly the status of the Milestones and Deliverables should be made. Responsible: Lesley Richards, Richard Bingley, Per Knudsen, Dov Rosen and Bente Lilja Bye, Deadline: 2005/05/31.

Action Item PT-5-14: Bring the question of deep ocean gauges and the classification system to the ESEAS GB. Responsible: Bente Lilja Bye, Deadline: 2005/06/10.

Action Item PT-5-15: The draft chapters of the White Paper shall be sent to the Coordinator/ESEAS Central Bureau. The ESEAS Central Bureau will distribute the collected draft White Paper and invite the ESEAS community to comment and contribute to the final writing. Responsible: Damila Gomis (technical status), Lesley Richards (data), Begoña Perez (operating tide gauges), Mikis Tsimplis (scientific applications), Bente Lilja Bye (background, warning system), Deadline: 2005/05/27.

Action Item PT-5-16: The WP leaders to identify and describe the most important result and future implementation and directions foreseen. Responsible: Dov Rosen, Lesley Richards, Richard Bingley, Per Knudsen, Bente Lilja Bye, Deadline: 2005/05/27.

Action Item PT-5-17: The Coordinator submit the WP reports, the revised TIP that will be included in the next Management report, and the Activity report to this meeting. Responsible: Bente Lilja Bye, Deadline: 2005/05/31.

Action Item PT-5-18: Decide final dates of the workshop after consulting with relevant organizations to avoid unwanted colliding events. Responsible: Bente Lilja Bye, PT, Deadline: 2005/05/27.

Action Item PT-5-19: Responsible: Initiate the planning process of the final Workshop. , Deadline: 2005/05/20.

Action Item PT-5-20: PT form the core group to write a proposal. Responsible: Per Knudsen, Bente Lilja Bye, PT Deadline: Immediately.

Action Item PT-5-21: A PT meeting will take place immediately after the final Workshop in Split. Responsible: Bente Lilja Bye and PT members Deadline: 2005/10.

Action Item GB-5bis-1: A draft work description for the Network Coordinator and the Product Coordinator, based on the ToR will be sent to the GB for written approval. Responsible: Susanna Zerbini, Per Knudsen and Bente Lilja Bye, Deadline: 2005/06/27.

Action Item GB-5bis-2: Draft a Call for participation 3 for written approval by the GB. Responsible: Bente Lilja Bye, Per Knudsen Deadline: 2005/06/24.

Action Item GB-5bis-3: GB members to submit names and addresses of institutions that should or will like to become members of ESEAS. Responsible: All GB members Deadline: 2005/07/01.

Action Item GB-5bis-4: The GB agreed to prolong the existing TEC until 1. November 2005, and asks the TEC Chair to continue his work as such until the end of this period. The Central Bureau is to communicate this request to the TEC. Responsible: Bente Lilja Bye, Deadline: As soon as possible before 24. June 2005.

Action Item GB-5bis-5: The TEC, GB Chair and CB to prepare a dicsussion paper for the future TEC based on the results from the Ad hoc working group on ESEAS 5 year strategy. Responsible: Bente Lilja Bye, Deadline: Two weeks before the next GB meeting (23. September 2005).

Action Item GB-5bis-6: The ESEAS web-site should have a legal disclaimer on the front page. Responsible: Bente Lilja Bye/Xiuhua Zhang, Deadline: as soon as possible.

Action Item GB-5bis-7: The GB members to consider hosting graduate students from the Indian Ocean Region for stays up til three months as part of ESEAS contribution to IOC work with establishing an Early warning system in the Indian Ocean. Report the result to CB. Responsible: All GB members, Deadline: 2005/06/24.

Action Item GB-5bis-8: The CB to inform Mikis Tsimplis that he is appointed as ESEASs contact person for MedCLIVar. Responsible: Bente Lilja Bye Deadline: 2005/06/24.

Action Item GB-5bis-1: . Responsible: Deadline: 2005/10/.