Deliverable D1.1
Last edited 24 November 2005
Description:
D1.1: Specifications for ESEAS Operational Sites
A deliverable of:
T1.1: Requirements for ESEAS Operational Sites satisfying the
criteria for Applications A - D will be specified (P1, P3, P5, P10, P12, P15, P16, P18) and the
proposed ESEAS Operational Sites will be classified according to these
specifications (P1, P5, P18). Only those sites meeting the requirements for at least
one specification will be certified as ESEAS Operational Sites.
Documents with the results:
- ESEAS observing site requirements
(html,
pdf)
- Table of requirements for application A
(pdf)
- Table of requirements for application B
(pdf)
- Table of requirements for application C1
(pdf)
- Table of requirements for application C2
(pdf)
- Table of requirements for application D
(pdf)